SpecProven

Guides

Special inspection forms by city

Direct answer: Most US cities start from IBC Chapter 17: the design professional prepares a Statement of Special Inspections, and the owner hires an approved agency (IBC 2024 §§1704.2–1704.3). Each city then has its own form. Below are the official forms for Miami-Dade County, San José, San Francisco DBI and Philadelphia, linked straight from each building department, with who signs each one and when it's due.

Quick reference

JurisdictionMain formWho prepares / signsAgency listNotes
Miami-Dade County, FLSpecial Inspector Employment Notice (Rev. 03/16)Owner retains a Florida-registered architect or PE as special inspectorn/a (inspector is an RA/PE)Threshold buildings also need the Threshold (Special) Inspector Building Affidavit
San José, CASpecial Inspection & Testing form, New Buildings · Existing BuildingsOwner/agent completes on the RDP's advice. Signed by RDP, owner, contractor, agency, building official.Recognized agencies2 copies to the Permit Center
San Francisco DBISpecial Inspection & Structural Observation Form"Prepared by: Engineer/Architect of Record"DBI-recognized agencies (PDF)Final compliance letter emailed to DBI
Philadelphia L&ISI-001 Statement of Special Inspections Schedule (2021 code) + SI-003 Duties & Responsibilities AgreementDPRC-SI (PE or RA) signs and seals SI-001. SI-003 is signed by owner, contractor and DPRC-SI.Lookup in eCLIPSE (active approvals only)Hold for Final Compliance Form

Miami-Dade County special inspection forms

Where: Miami-Dade's Inspections page lists the Special Inspector Employment Notice and the Threshold (Special) Inspector Building Affidavit, plus lightweight insulating concrete (LWIC) forms.

Special Inspector Employment Notice

From the form (Rev. 03/16):

Threshold buildings

San José special inspection forms

Where: the City of San José Building Division Bulletins & Forms page, under "Special Inspection."

FormUse
Special Inspection and Testing Form, **New Buildings** (Form #345, rev. 06/29/22)New construction (2019 CBC §§1704/1705)
Special Inspection and Testing Form, **Existing Buildings** (Form #344)Alterations/additions to existing buildings
Recognized special inspection and testing agencies (updated Jan. 9, 2025)Agencies and the services each is recognized for (RC, PC, SM, SW, HSB, NDT, SWC, FP), with expiration dates. Agencies marked "Pending Review" are recognized.

The city's forms page still posts Form #345 as the 06/29/22 edition citing the 2019 CBC. No newer CBC revision of that form was listed on Oct 31, 2026. Match the form edition to your permit's code year.

Key requirements on Form #345 (PDF):

San Francisco DBI special inspection form

Where: SF.gov Inspection Services key documents.

DocumentLink
Special Inspection and Structural Observation FormPDF
Special Inspections Process (how to submit reports and final compliance letters)PDF
DBI-recognized special inspection and testing agenciesPDF

What the form says (PDF):

Closing out in SF (Special Inspections Process):

  1. Find the required special inspections on the approved drawings or the permit's online "Special Inspections" section.
  2. Get the final compliance letter and test reports from your architect, engineer or agency. DBI provides a sample letter that lists each inspection code to be cleared.
  3. Email the letter and supporting documents to dbi.specialinspections@sfgov.org, with the address and permit number in the subject line.
  4. Allow 10 business days, then check online for a "Completed Date" and inspector initials. Don't resubmit.

Philadelphia special inspections (L&I)

Where: Philadelphia L&I's Special Inspections information page. The owner or design professional must hire a special inspection agency for some projects. L&I monitors compliance, and special inspections don't replace L&I inspections.

FormDetail
SI-001 Statement of Special Inspections Schedule (2021 code, fillable)Property address, owner, DPRC-SI (PE or RA) with seal. For each inspection: the required license category, verification, continuous/periodic, and agency.
SI-003 Special Inspections Duties & Responsibilities Agreement (updated 1/2026)Signed by owner, contractor and DPRC-SI, and filed with the permit application (L&I 2023 program presentation)

How the process works (per L&I's 2023 program presentation):

Note: Philadelphia's business-services page for the program (business.phila.gov/special-inspections-program/) didn't load on Oct 30, 2026, so it isn't cited here.

Before you submit any city's form: checklist

CheckWhy
The form edition matches your permit's code yearSan José #345 cites 2019 CBC; Philadelphia SI-001 cites the 2021 code
Every agency is on the city's current recognized list for that disciplineSan José and SF publish lists; Philadelphia limits eCLIPSE to active approvals
The required signatures are collected before permit issuanceSee each form above and IBC §1704.2.3
Your ITP lines map to each form itemSo you can produce the closeout evidence (see our ITP template)

FAQ

Where do I get the Miami-Dade special inspection form?

From Miami-Dade's Building Inspections page. The Special Inspector Employment Notice is here, and threshold buildings also need the Threshold (Special) Inspector Building Affidavit.

What is the City of San José special inspection form?

San José uses a Special Inspection and Testing Form for new buildings and one for existing buildings, posted on the Building Division's Bulletins & Forms page. The owner or agent completes it on the RDP's advice and submits two copies to the Permit Center.

Where is the SF DBI special inspection form?

The Special Inspection and Structural Observation Form is on SF.gov's Inspection Services key documents page (direct PDF). It's prepared by the engineer or architect of record.

How do special inspections work in Philadelphia?

A single DPRC-SI signs and seals the SI-001 Statement. The owner, contractor and DPRC-SI sign the SI-003 agreement, which is filed with the permit. Agencies are entered in eCLIPSE, and a hold for the Final Compliance Form stays on the permit until all inspections are complete (L&I; 2023 program presentation).

Who hires the special inspector?

Generally the owner. The IBC says the owner or owner's agent (not the contractor) employs the approved agency (IBC 2024 §1704.2). Miami-Dade and SF state the same on their forms (Miami-Dade; SF DBI).

Different form in every city, same proof at closeout

SpecProven doesn't fill out city forms. It builds the inspection plan from your specs. When a section is silent on a usual IBC Chapter 17 special inspection, it adds a note (how it works). After the plan is built, SpecProven matches incoming inspection reports to the plan lines they prove. A paid pilot is $2,900 to start and covers four projects, then $500 per project per month after the four included. Pricing.

Sources