SpecProven

For general-contractor quality teams

The inspection plan, tied to the proof.

Quality managers still build inspection and test plans by reading the spec into a spreadsheet, then rebuild the file at turnover. SpecProven writes the plan from the documents and keeps every report on the line it proves.

4
Reports
2
Passed
0
Failed
1
In progress

Find Reports

4 inspections found

  • Pass

    Compressive strength

    Northline Testing · Level 2 podium slab, Grid C4 · 05/16/2026

  • Fail

    Grout compressive strength

    Northline Testing · Level 2 CMU wall, grid W-12 · 04/30/2026

  • Pass

    Grout compressive strength

    Northline Testing · Level 2 CMU wall, grid W-12 · 05/20/2026

  • Pending

    Flood test

    Harbor Envelope QA · Roof terrace · 04/26/2026

01

Read the project manual

Upload the specifications. SpecProven splits them by CSI section, keeps the page text, and marks any page it could not read.

02

Draft the inspection plan

Each field test becomes a line with its standard, frequency, acceptance criteria, and the paragraph it came from.

03

File the proof as it arrives

Inspection reports are parsed and suggested against the line they prove. A failure stays in the record when the retest passes.

Built for the people who own the quality file

Project engineers, quality managers, and superintendents on hospitals, data centers, and industrial plants, where the spec is thick and the closeout package is how you get paid.

  • Hold, witness, and review points sit on the line.
  • A note appears when a section is silent on a usual IBC Chapter 17 special inspection.
  • Excel, branded PDF, and Procore / Autodesk import files are the handoff. Those platforms stay the system of record for the rest of the job.
SECTION 03 30 00 — CAST-IN-PLACE CONCRETE
3.6 FIELD QUALITY CONTROL
  Compressive strength: ASTM C39/C39M
  Cast one set of cylinders for each 50 cubic yards
  Strength shall equal or exceed f'c at 28 days.